Know the land you need before you look at blocks
Work through budget, house plans, block basics, orientation and build factors. Each answer is sorted into Must have, Prefer or Deal breaker, and you finish with a one-page brief to print or share.
checklistPick an answer and it is sorted for you. To move it, use the Must have, Prefer and Deal breaker buttons on that row.
lockAnswers are saved in this browser only. Nothing is sent to us.
01
Budget
Agree the numbers first. Land and build are bought separately, so set both, plus what is held back for site costs and upgrades.
Land budget
Build budget
House & Land total
Fills in from land plus build. Type over it to set your own.
Set aside for site costs and upgrades
Sloping, filled or rocky blocks cost more to build on, and most buyers add upgrades to the base price.
Hard ceiling, all in
The most the client will pay for land, build, site costs and upgrades together.
02
House needs decide land needs
Start with the house. Storeys, garage width and extras set how wide and how big the block has to be.
Storeys
Bedrooms
Bathrooms
Car spaces
Second living area
Study
Media room
Granny flat or dual living
Council rules for a second dwelling depend on lot size and zoning. Check before choosing a block.
Pool
Backyard size
Side access for a boat, trailer or caravan
Needs about 3 m clear down one side of the house.
What this house needs from the land
Choose storeys and bedrooms to see a starting size.
Frontage
m
Land area
m²
Depth
m
A rule of thumb from common South East Queensland house and land designs. The builder's floorplan and the estate's design guidelines have the final say.
03
Block basics
The measurements and block types that decide which lots make the shortlist.
Minimum land area
Minimum frontage
Width of the block along the street.
Preferred depth
Block shape
Corner block
Two street sides: more fencing and often stricter facade rules.
Battle-axe block
Sits behind another lot with a driveway out to the street.
Slope
Title registration
Unregistered land settles when the estate stage registers, which can take months.
04
Orientation and lifestyle
How the client will live in the house. In Queensland a north-facing backyard gets the winter sun, and west-facing rooms take the afternoon heat.
Backyard facing
Light in the living area and backyard
Afternoon west sun
Views and privacy
Next to a main road
Next to a park
Quiet street
Near the estate entrance
05
Things that can affect the build
None of these rules a block out on its own, but each can change the design or the cost. Mark how the client feels about each one. Anything set to Check first goes on the list to confirm for every block.
Easement on the block
A strip kept clear for pipes or drainage. You generally cannot build over it.
Building envelope
The area on the plan where the house has to sit.
Setback rules
Minimum distances from the front, side and rear boundaries.
Slope and retaining walls
A fall across the block can mean retaining walls, a split-level slab or extra earthworks.
Sewer and stormwater location
Where the connection points and any manholes sit on the lot.
Filled land
Fill can need deeper footings or piers. Ask for the compaction certificate.
Estate design guidelines
Estate rules on facade, materials, fencing and landscaping.
Nominated builder or set designs
Some estates only allow certain builders or house designs.
Extra site costs
Rock, slope, fill, bushfire or flood overlays and long service connections all add to the build price.
Get market insights by email
New listings, suburb research and calculator updates from the Plus Value Property team, a few times a month. Unsubscribe any time.
Nearly done. Check your inbox and click the link to confirm.
You're already subscribed.
Thanks, you're on the list.